GREENFIELD AIa LightRail AI division
Architectural concept of a Greenfield AI campus in a forest landscape

AI-native infrastructure

Greenfield AI

High-density compute.
Zero-water cooling.

A new generation of data centers, designed around the demands of AI. From foundation to fabric, more compute with a lighter footprint.

Greenfield AI campus · architectural concept

The next generation of compute

We make AI-native infrastructure possible.

The factory that built the Cloud cannot build AI. Purpose-built power, cooling and connectivity unlock high-density workloads without legacy compromises.

Live power telemetry

simulated
Legacy cloud
AI training
- - Legacy ceiling

Current draw: Burst — exceeds legacy capacity

The Retrofit Trap

Millions in Capex for a Compromised Asset.

Upgrading existing facilities yields suboptimal performance due to 3 fatal bottlenecks. Select one to see the physics.

Diagnostic · Rack weight

Loaded AI rack3,000 lbs
Typical raised-floor rating1,250 lbs

42% of requirement

Retrofitting closes this gap only partially — at full capex cost — leaving a compromised asset.

The Greenfield Imperative

Zero legacy constraints or structural compromises.

Zero operational downtime risks for existing tenants.

100% native AI architecture from foundation to fabric.

Pillar 01 · High-Density AI Rack Architecture

Built natively for 80+ kW per rack.

No reinforcement projects, no airflow compromises. The floor, power and fabric are designed around the GPU from day one.

01

80+ kW per rack

Natively supported power density.

02

8–16 GPUs per chassis

Engineered for dense GPU configurations.

03

Unrestricted routing

Low-latency InfiniBand & ultra-scale Ethernet.

Pillar 02 · The Water Crisis in Compute

Legacy cooling consumes 4.5 Trillion Liters annually.

Hyperscalers and municipalities face imminent water bans and ESG regulatory timebombs.

4.5T

liters per year

1.8M

Olympic pools

1.3B

people's water equivalent

The Zero-Water Solution

Fluorinated Two-Phase Immersion.

Completely closed thermal loop, zero water consumption, no mechanical pumps required for circulation.

CONDENSER COILHEADSPACE

The Science of Cooling

Air vs Hydrocarbon Oil vs Fluorinated Two-Phase

Fluorinated Two-Phase

Cooling Limit
80kW+
Flash Point / Safety
None / Non-flammable
PUE Efficiency
1.03 PUE
Water Consumption
Zero

Pillar 03 · Total Cost of Ownership

PUE 1.03: almost every dollar of power goes directly to compute.

Model your site. Adjust power, cooling and energy-cost assumptions, then compare two scenarios side by side.

Power assumptions

Facility capacity (IT load)50 MW
Rack density80 kW/rack

Cooling assumptions

Legacy air-cooled PUE1.60
Greenfield two-phase PUE1.03
Legacy water use (WUE)1.8 L/kWh

Energy assumptions

Energy cost$0.080/kWh

At 80 kW/rack, air cooling (max ~30kW) can't serve this design — legacy figures are a best-case baseline.

Annual power savings

$20.0M

Water saved / year

788.4M L

315 Olympic pools

Compute yield boost

+55%

more compute per grid MW

Racks required

625

at 80 kW/rack

Where the power goes

Legacy62.5% to compute
Greenfield AI97.1% to compute

Scenario comparison

MetricAB
Capacity50 MW150 MW
Energy cost$0.080$0.120
PUE legacy → GF1.60 → 1.031.60 → 1.03
Power savings / yr$20.0M$89.9M
Water saved / yr788.4M L2.37B L

Estimates for planning only. Assumes 24/7 IT load over 8,760 hours; water saved equals legacy evaporative use since two-phase immersion consumes zero water. Also eliminated: structural capex upgrades and water utility bills.

Anatomy of the Ultimate Compute Factory

Foundation to fabric, designed as one system.

High-density compute + closed-loop zero-water heat rejection + optimized floor loading & unrestricted fabric. Tap a hotspot to explore.

0180kW+ racks

High-density compute

Immersion tanks hold 8–16 GPU chassis per bay at 700W+ per GPU. Racks are sized for compute, not for airflow clearance.

Hyperscaler Procurement Diagnostic

Is your site qualifying AI capacity?

Evaluate a planned or legacy site against the three questions hyperscaler procurement teams ask first.

01

Max power density without structural capex?

Greenfield AI → 80kW+ natively supported.

02

High-density cooling architecture?

Greenfield AI → Zero-Water Two-Phase Liquid.

03

Unrestricted interconnect scale?

Greenfield AI → Native GPU cluster fabric pathways.

Readiness result

Answer all three questions to see your readiness score. (0/3 answered)

Future-Proofing the Asset

Three threats. Each one defeated.

01

Municipal water bans & ESG mandates

Defeated by

Zero-Water

02

Stranded asset obsolescence

Defeated by

Greenfield AI Architecture

03

Exponential thermal limits of next-gen GPUs

Defeated by

Two-Phase Immersion

For data center operators

Build for the Workload. Command the Yield.

Request a Greenfield AI consultation. Our engineers will review your site, power and timeline.

bola.olatunji@lightrailabs.ai