
AI-native infrastructure
Greenfield AI
High-density compute.
Zero-water cooling.
A new generation of data centers, designed around the demands of AI. From foundation to fabric, more compute with a lighter footprint.
Greenfield AI campus · architectural concept
The next generation of compute
We make AI-native
infrastructure possible.
The factory that built the Cloud cannot build AI. Purpose-built power, cooling and connectivity unlock high-density workloads without legacy compromises.
Live power telemetry
simulatedCurrent draw: Burst — exceeds legacy capacity
The Retrofit Trap
Millions in Capex for a Compromised Asset.
Upgrading existing facilities yields suboptimal performance due to 3 fatal bottlenecks. Select one to see the physics.
Diagnostic · Rack weight
42% of requirement
Retrofitting closes this gap only partially — at full capex cost — leaving a compromised asset.
The Greenfield Imperative
Zero legacy constraints or structural compromises.
Zero operational downtime risks for existing tenants.
100% native AI architecture from foundation to fabric.
Pillar 01 · High-Density AI Rack Architecture
Built natively for 80+ kW per rack.
No reinforcement projects, no airflow compromises. The floor, power and fabric are designed around the GPU from day one.
80+ kW per rack
Natively supported power density.
8–16 GPUs per chassis
Engineered for dense GPU configurations.
Unrestricted routing
Low-latency InfiniBand & ultra-scale Ethernet.
Pillar 02 · The Water Crisis in Compute
Legacy cooling consumes 4.5 Trillion Liters annually.
Hyperscalers and municipalities face imminent water bans and ESG regulatory timebombs.
4.5T
liters per year
1.8M
Olympic pools
1.3B
people's water equivalent
The Zero-Water Solution
Fluorinated Two-Phase Immersion.
Completely closed thermal loop, zero water consumption, no mechanical pumps required for circulation.
The Science of Cooling
Air vs Hydrocarbon Oil vs Fluorinated Two-Phase
Fluorinated Two-Phase
- Cooling Limit
- 80kW+
- Flash Point / Safety
- None / Non-flammable
- PUE Efficiency
- 1.03 PUE
- Water Consumption
- Zero
Pillar 03 · Total Cost of Ownership
PUE 1.03: almost every dollar of power goes directly to compute.
Model your site. Adjust power, cooling and energy-cost assumptions, then compare two scenarios side by side.
Power assumptions
Cooling assumptions
Energy assumptions
At 80 kW/rack, air cooling (max ~30kW) can't serve this design — legacy figures are a best-case baseline.
Annual power savings
$20.0M
Water saved / year
788.4M L
315 Olympic pools
Compute yield boost
+55%
more compute per grid MW
Racks required
625
at 80 kW/rack
Where the power goes
Scenario comparison
| Metric | A | B |
|---|---|---|
| Capacity | 50 MW | 150 MW |
| Energy cost | $0.080 | $0.120 |
| PUE legacy → GF | 1.60 → 1.03 | 1.60 → 1.03 |
| Power savings / yr | $20.0M | $89.9M |
| Water saved / yr | 788.4M L | 2.37B L |
Estimates for planning only. Assumes 24/7 IT load over 8,760 hours; water saved equals legacy evaporative use since two-phase immersion consumes zero water. Also eliminated: structural capex upgrades and water utility bills.
Anatomy of the Ultimate Compute Factory
Foundation to fabric, designed as one system.
High-density compute + closed-loop zero-water heat rejection + optimized floor loading & unrestricted fabric. Tap a hotspot to explore.
High-density compute
Immersion tanks hold 8–16 GPU chassis per bay at 700W+ per GPU. Racks are sized for compute, not for airflow clearance.
Hyperscaler Procurement Diagnostic
Is your site qualifying AI capacity?
Evaluate a planned or legacy site against the three questions hyperscaler procurement teams ask first.
Max power density without structural capex?
Greenfield AI → 80kW+ natively supported.
High-density cooling architecture?
Greenfield AI → Zero-Water Two-Phase Liquid.
Unrestricted interconnect scale?
Greenfield AI → Native GPU cluster fabric pathways.
Readiness result
Answer all three questions to see your readiness score. (0/3 answered)
Future-Proofing the Asset
Three threats. Each one defeated.
Municipal water bans & ESG mandates
Defeated by
Zero-Water
Stranded asset obsolescence
Defeated by
Greenfield AI Architecture
Exponential thermal limits of next-gen GPUs
Defeated by
Two-Phase Immersion
For data center operators
Build for the Workload. Command the Yield.
Request a Greenfield AI consultation. Our engineers will review your site, power and timeline.